IDC were employed by our repeat client to assist in the coordination of several floors within a CAT A fit out of a large new build office block development in Edinburgh. The works included:
- Full coordination of all MEP services, interfacing with specialist contractors such as the installers of the sprinkler system.
- Production of installation drawings, annotated to include setting out dimensions and elevations.
- Builders work drawings, including schedules, produced from the model to ensure any penetrations were accurately sized and located during the building fabric construction process.
The main difficulty of the project lay in the inclusion of castellated beams and exposed services throughout, meaning the coordination had to be functional while maintaining a desirable aesthetic.